新着情報

NPO法人アジアの誇り・プレアビヒア日本協会 / Pride of Asia ; Preah Vihear Association Japan | HOME >> 新着情報

Holding study sessions on environmental maintenance management with the Tree Planting Committee team


[ October 19, 2023 ]
As part of this year's tree-planting activities, we held a study session on maintenance and management with local residents. We received an explanation from an expert teacher from Japan and learned the importance of water management and weeding work during the dry season.

Participants in environmental study sessions
(Participants in environmental study sessions)

Environmental study session
(Environmental study session)
 

Visit to Eco-Village and meeting with tree planting committee team


[ October 19, 2023 ]
The local people are always cheerful and energetic. We asked them about their various challenges and hopes, including tree-planting activities and agricultural strengthening projects.

Meeting with the tree planting committee
(Meeting with the tree planting committee)

Meeting with the tree planting committee 2
(Meeting with the tree planting committee 2  

Renewal of Hanabatake Park


[ October 19, 2023 ]
NAPV has planned to renovate the flower garden that PVAJ maintained in the past while preserving the old trees, and it is now being developed into a flower garden park. Nearby farmers were also working hard on civil engineering work. But there were lots of smiles. Next year, the park will be filled with flowers.

Making a flower garden
(Making a flower garden)

Making a flower garden 2
(Making a flower garden 2)
 

Growth of trees after planting


[ October 18, 2023 ]
We have confirmed the results of past tree planting activities conducted by PVAJ. It is growing beautifully. Compared to Japan, its growth is rapid. Some of the trees have already grown taller. Additionally, during the construction of the agricultural pond in 2020-2021, the trees planted around the pond have grown and formed the landscape around the pond. From front to back, there are shrubs, medium trees, and tall trees.

Growth of trees planted in 2020
(Growth of trees planted in 2020)

Growth of trees planted in 2020 2
(Growth of trees planted in 2020 2)

Growth of trees planted in 2020 3
(Growth of trees planted in 2020 3)
 

Tree Planting Festival and commemorative tree planting activities


[ July 31, 2023 ]
We participated in the Tree Planting Festival and carried out tree planting activities with local residents. A commemorative tree planting event was held with many residents and students. We looking forward to seeing the growth in the next three years.

tree planting festival
(tree planting festival)

With tree planting participants
(With tree planting participants)

Commemorative tree planting
(Commemorative tree planting)

Commemorative tree planting 2
(Commemorative tree planting 2)
 

Project meeting held with NAPV


[ July 31, 2023 ]
PVAJ had July meeting with NAPV. We confirmed the progress of the 2023 project, shared issues for the 2024 project, and confirmed the project plan. We also confirmed that NAPV would like to develop a nursery and provide Seedling.

Project meeting with NAPV
(Project meeting with NAPV)
 

Pagoda land leveling and sapling presentation for the 2023 Tree Planting Festival


[ July 21, 2023 ]
We are planning to plant trees in collaboration with the Pagoda District in preparation for the Tree Planting Festival at the end of July. In preparation for tree planting, we purchased seedlings, leveled the land, and held a presentation ceremony for some of the seedlings to be used for pagoda planting.

tree planting hole drilling
(tree planting hole drilling)

Joint tree planting seedling presentation ceremony with pagoda
(Joint tree planting seedling presentation ceremony with pagoda)
 

Joint planting of coconut saplings with NAPV


[ July 20, 2023 ]
Based on discussions at a meeting with NAPV, we prepared and jointly planted coconut saplings to commemorate the 15th anniversary of the registration of Preah Vihear Temple as a World Cultural Heritage Site this July.

coconut tree planting
(coconut tree planting)

coconut tree planting 2
(coconut tree planting 2)
 

PVAJ members stay at Eco-Village


[ June 27, 2023 ]
27th: Phnom Penh-Eco-Village transfer
28th: NAPV discussion, pagoda discussion, tax office visit
NAPV members visited Eco-Village and exchanged opinions with NAPV. We confirmed the results of activities in 2022 and discussed plans for 2023 and 2024. In addition to the activities at Eco-Village, activities at the Koh Ker Ruins also became a hot topic. PVAJ would like to cooperate in the conservation and protection of the Koh Ker Ruins. We met with the village representative and discussed co-hosting a tree planting event with the pagoda. Afterwards, inspected the growth of previously planted seedlings at Eco Park.

Meeting with the pagoda committee
(Meeting with the pagoda committee)

Growth of previously planted trees
(Growth of previously planted trees)

Growth of previously planted trees 2
(Growth of previously planted trees 2)
 

Holding the 2023 General Meeting


[ June 24, 2023 ]
PVAJ's 2023 General Assembly Meeting was held at the Ochanomizu office. The meeting was established with the attendance of 16 out of 22 regular members (73%). The 2022 activity report and financial report were approved, and the 2023 plan was reported.
2022 Activity Report (PDF)  

Meeting with the Cambodian Tax Office for local NGO activities


[ June 13, 2023 ]
In Cambodia, it is mandatory to report the income and expenditure of activities through e-tax every month. Then, in March, PVAJ will pay taxes for the period from January to December. Since our organization is an NGO, we receive tax exemptions for non-profitable activities. Currently, we do not engage in any profitable business, as all of our projects are subsidized by Japanese companies and the government. Therefore, it is exempt from tax. As a corporation, it is important for us to regularly exchange opinions with the tax office, and we are kindly asked to learn about taxation in Cambodia.
 

Land preparation work in preparation for this year's tree planting on site


[ May 5, 2023 ]
In cooperation with local residents, we carried out weeding and leveling work in this year's tree-planting area. At the same time, weeding was also carried out in areas where trees had been planted up until last year. The trees planted in the past are growing nicely.

Land leveling work 1
(Land leveling work 1)

Land leveling work 2
(Land leveling work 2)
 

Meeting with farmers at Eco-Village


[ April 27, 2023 ]
Together with NAPV members at the ecovillage, we conducted a survey of candidate sites for future agricultural irrigation water supply projects. We visited three candidate locations and held meetings with residents.

(1) Meeting 1, discussion of tree planting plan for environmental improvement
(2) Meeting 2, discussion on agricultural water-stressed areas
(3) Meeting 3, discussion of tree planting plan for environmental improvement (cooperation with pagoda tree planting)

NAPV打合せ
(NAPV打合せ)

Farmer tree planting committee meeting
(Farmer tree planting committee meeting)

Meeting with neighboring farmers
(Meeting with neighboring farmers)
 

PVAJ staff visited Phnom Penh


[ April 26, 2023 ]
The COVID-19 pandemic has passed, and Phnom Penh is returning to its lively past. However, the number of people from China seems to be still small.

Phnom Penh city
(Phnom Penh city)

Phnom Penh has returned to its former bustle
(Phnom Penh has returned to its former bustle)
 

Visiting guest from Japan


[ March 26, 2023 ]
A guest from Japan arrived in Simreap on March 26th, and PVAJ members greeted and guided them around. We cooperated with NAPV (National Authority for Preah Vihear, Ministry of culture and fine arts, Cambodia government) to visit the Preah Vihear temple and Kho Ker ruins, and inspected their historical background and current state of conservation. We were also able to introduce PVAJ's local activities.

Preah Vihear Temple Ticket Center
(Preah Vihear Temple Ticket Center)

At Preah Vihear temple
(At Preah Vihear temple)
 

UNESCO-ICC meeting


[ March 21, 2023 ]
The event was held by the International Coordinating Committee for Preah Vihear (ICC-PV) sponsored by UNESCO, with NAPV (National Authority for Preah Vihear, Ministry culture and fine arts Cambodia) serving as the secretariat. Reports on the past year's research at Preah Vihear Temple and Koh Ker ruins, as well as future challenges, etc. Many stakeholders, including UNESCO, Japan, the United States, China, India, Thailand, and Italy, gathered together to exchange opinions. PVAJ was also invited to attend. Activities toward the registration of the Koh Ker Ruins as a World Heritage Site were also reported.

ICC-PV opening ceremony
(ICC-PV opening ceremony)

Opening speech by NAPV Director General
(Opening speech by NAPV Director General)
 

Visit to Preah Vihear Temple World Heritage Site


[ February 11, 2023 ]

I visited Preah Vihear temple. Over the past four years, we had expected that temple restoration projects in each country would be delayed and the number of visitors would decrease due to the impact of Covid-19, but the situation there has changed significantly.

(1) Entrance fee and summit truck fee
The entrance fee to Preah Vihear World Heritage Site was 10$, the same as before. And the round-trip fee for a pickup truck to drive into the World Heritage Site, where access to general vehicles is restricted, remains unchanged at $25.
Ecovillage and temple map
(Ecovillage and temple map)

Ticket center and temple map
(Ticket center and temple map)

Ticket center map (enlarged)
(Ticket center map (enlarged))

Pickup truck to world heritage site
(Pickup truck to world heritage site)

(2) Gopura5 Stair Repair
As part of the U.S. Embassy's Preah Vihear temple restoration project, a project to restore the stairs leading to Gopura 5, which faces the Thai border, was being carried out.
A stone quarry for the steps has been set up on site, and a booth has been set up to explain the project, with information on the history of the temple and restoration methods posted.
Gopura5 Stone quarry for repairing stairs
(Gopura5 Stone quarry for repairing stairs)

Facility explaining the project to repair the stairs at Gopura 5
(Facility explaining the project to repair the stairs at Gopura 5)

Explanation panel explaining the project to repair the stairs in Gopura 5
(Explanation panel explaining the project to repair the stairs in Gopura 5)

View from Gopura 5 on the Thai side
(View from Gopura 5 on the Thai side)

US-built stairs to Gopura 5
(US-built stairs to Gopura 5)

Gopura 5 today
(Gopura 5 today)

(3) Preah Vihear Temple
I visited the approach to Preah Vihear temple. It is said to have been built by the Khmer people at the end of the 9th century and expanded in the 11th century.The approach is approximately 800 meters long and is located at the top of a cliff 625 meters above sea level in the Danglek Mountains. There is a 120m elevation difference between Gopura 5 (northern side, near the Thai border) and Gopura 1, making it a fairly steep climb. Although it is inside a World Heritage Site, there is a principal image of Buddha in the precincts behind Gopura 1, and there is a monk there, who took this opportunity to read a sutra.

Temple floor plan
(Temple floor plan)

Gopura 5 front
(Gopura 5 front)

Gopura 4 front
(Gopura 4 front)

Gopura 3 front
(Gopura 3 front)

Gopura 2 front
(Gopura 2 front)

The principal image in Gopura1
(The principal image in Gopura1)

Gopura 1 corridor
(Gopura 1 corridor)

 

On-site confirmation of the progress of N-Ren project equipment and dry season agriculture completed in March 2022


[ February 10, 2023 ]
On-site confirmation of the progress of N-Ren project equipment and dry season agriculture completed in March 2022

(1) Situation around Agricultural Pond
Although early February is the second half of the dry season, there is still water in the pond at a depth of about 1 meter, allowing for sufficient water supply during the dry season. Two lifeguards continue to be stationed at the surveillance house to manage the facility.

Dry season Pond in 2023
(Dry season Pond in 2023)

Surveillance house in 2023
(Surveillance house in 2023)

Panoramic view of the facility dry season in 2023
(Panoramic view of the facility dry season in 2023)

(2) Growth of trees around the pond
Trees from the 2020-2021 tree planting project were growing smoothly. The large tree is already over 2m tall. In a few years (3 to 5 years), we can expect the tree to grow to the point where it will provide shade around the pond.
On the other hand, the area south of the pond and close to the river is a somewhat wetland area, probably due to flooding during the rainy season, and the growth of trees seems to be slow.

2020 tree planting growth 1
(2020 tree planting growth 1)

2020 tree planting growth 2
(2020 tree planting growth 2)

2020 Tree Planting Growth 3 Wetlands
(2020 Tree Planting Growth 3 Wetlands)

 

2023 tree planting project meeting with residents


[ February 10, 2023 ]

We discussed with residents regarding ecovillage tree planting in 2023.
From 11 a.m. on February 10th, we had meeting with 15 villagers, including the village chief, about past agricultural projects and plans for this year's tree-planting project at the Eco-Village.
(1) Past agricultural water supply projects
All farmers reported that they were very satisfied with the harvest achieved through dry season farming. In the past, there was no harvest during the dry season and people had to work abroad to make a living, but with the introduction of agricultural water supply projects, it has become possible to produce vegetables during the dry season, which can be sold not only for home consumption but also individually to residents within the ecovillage. It has also been reported that it is now possible. In addition, it has been reported that the water supply is not only used for agricultural production, but can also be used for domestic purposes (washing, watering garden trees, etc.), leading to an improvement in the living environment. However, there were some issues, as the water pressure decreased at the end of the water supply, making it impossible to secure enough water, and it took time to obtain the required amount of water, so improvements were proposed.

(2) Tree-planting activities In past tree-planting efforts, there were reports that trees had dried up due to lack of water during the dry season, and some small seedlings in particular were unable to take root. It was proposed that there be a need to secure as many large and healthy seedlings as possible, and that the authority should support the nursery project and plant high-quality seedlings from among them.
In this year's tree-planting project, the tree-planting area will be weeded and leveled, and seedlings will be secured during the period until June, and eco-village tree planting will be carried out in time for Cambodia's national tree-planting festival in July. It was suggested that.
 

Farmer meeting participants
(Farmer meeting participants)

Farmer meeting
(Farmer meeting)

Irrigation water from the reservoir project can also be used as daily water for farmers.
(Irrigation water from the reservoir project can also be used as daily water for farmers.)

Dry season vegetable cultivation continues this year too
(Dry season vegetable cultivation continues this year too)

Lots of vegetables even in the dry season
(Lots of vegetables even in the dry season)

Village nursery construction
(Village nursery construction)

 

Project meeting with NAPV


[ February 10, 2023 ]

On February 10, 2023, we held project discussions with NAPV. We had a project meeting with the National Authority for Preah Vihear (NAPV) of Ministry of Minister of Culture and Fine Arts Cambodia. We discussed regarding 2023 and future development planning projects with Mr. Eang Hourt, Deputy Director-General, Mr. Kim Samnang, Director of Urban Management and Regional Development Department, and Yong Sophack of the Urban Management and Regional Development Department. In particular, we have confirmed the annual tree planting plan for 2023.  

Discussion with the Deputy Director General and Director of the Authority 1
(Discussion with the Deputy Director General and Director of the Authority 1)

Discussion with the Deputy Director General and Director of the Authority 2
(Discussion with the Deputy Director General and Director of the Authority 2)

Authority building front entrance
(Authority building front entrance)

Road traffic around the Eco-Village
(Road traffic around the Eco-Village)

 

Energy of Preah Vihear Ecovillage during the dry season (3) From Phnom Penh to ecovillage


[ February 9, 2023 ]

Arrived at Sra-Aem in Eco-Village on the evening of February 9, 2023.
We entered the city of Sulaem. A new city is booming. Various shops have opened, new guesthouses have opened, and everyone is doing well.  

Market street in Sra Aem
(Market street in Sra Aem)

Market in Sra Aem
(Market in Sra Aem)

JAYA Hotels in Sra Aem
(JAYA Hotels in Sra Aem)

Inside JAYA Hotel
(Inside JAYA Hotel)

 

Energy of Preah Vihear Ecovillage during the dry season (2) From Phnom Penh to ecovillage


[ February 9, 2023 ]

In the afternoon of February 9, 2023, we will travel 250km from Phnom Penh to Eco Village.
On the afternoon of February 9th, from Phnom Penh to the ecovillage, a distance of about 250km, in our usual Vireak car, which took 5 hours. While admiring the tranquil scenery of Route 6, we continued our journey through the beautiful Khmer scenery of Cambodia, all the way to the eco-village at the northern tip of Preah Vihear province.  

Traffic along National Route 6
(Traffic along National Route 6)

Near Eco Village along National Route 6
(Near Eco Village along National Route 6)

 

Energy of Preah Vihear Ecovillage during the dry season (1) From Phnom Penh to ecovillage


[ February 9, 2023 ]

On February 9, 2023, we held a meeting to exchange project information with member companies in Phnom Penh.
On the morning of February 9th, we visited Shibata Ogura Worldwide Alliance (SOWA) (www.sowakh.com), a local subsidiary of Shibata Kogyo Co., Ltd., a member of the organization active in Phnom Penh, and held a meeting for this year's local project. SOWA is engaged in the construction industry and agricultural and water resource development in Cambodia. We are working on the development of Cambodia in cooperation with the agricultural development association. Mr. Kimori and Mr. Ratanak, thank you for taking the time out of your busy schedules.  
 

Selected for the 32nd Aeon Environmental Activities Grant


[ January 24, 2023 ]

We were selected by the Aeon Environmental Foundation as a grant organization for the 32nd project. Environmental activities will be carried out at the eco village from April 1, 2023 to March 31, 2024. We foster environmental awareness among local residents, improve the local environment through activities such as tree planting, and create opportunities for joint activities among residents.
 

Adopted as a subsidized project by the Japan-China Friendship Center's "Japan-China International Solidarity Project on Afforestation and Tree-planting"


[ December 21, 2022 ]

Adopted for the "Japan-China International Solidarity Project on Afforestation and Tree-planting" by the Japan-China Friendship Center. The Japan-China International Solidarity Project on Afforestation and Tree-planting Project promoted by the Ministry of Foreign Affairs. We have applied for a 2022 project public offering for afforestation projects and related projects aimed at solving global environmental problems in the region. This time, it was adopted, and from January 1, 2023 to 12 months, it was decided to implement a tree planting project in the eco-village area of 5 hectares. A tree-planting team will be formed locally, and a tree-planting event will be held with the aim of planting 7,000 trees. We are looking forward to your participation from Japan.

Support project by SDGs contribution limited use donation" End of donation and decided to implement our project


[ November 09, 2022 ]

We applied for the National Land Afforestation Promotion Organization's "SDG Contribution Limited Fundraising" project. The deadline was October 31st, and as a result, with the support of donations without project designation, we were able to implement the “Forest Creation in Preah Vihear Temple Area, a World Cultural Heritage Site” in one year from December 2022. Thank you very much for all your donations during this period. The rainy season has ended and the dry season is approaching, making it difficult to plant trees due to the lack of water in the natural environment. In this year's project, we are planning to have all of our members participate. We are planning to support some expenses, so please join us.  

Passed the primary screening for the 2023 Resona Environmental Grant


[ October 21, 2022 ]

Our proposed project has passed the first screening for the 2023 Resona Environmental Grant sponsored by the Resona Foundation for Asia and Oceania.The Resona Asia-Oceania Foundation supports SDGs projects that aim to strengthen cooperation between Japan and the Asia-Oceania region. Our association applied for support (three-year plan) for environmental activities (tree planting activities) in the eco-village, passed the first screening, and proceeded to the second screening. The final result will be in February 2023.  

Resona decision notice
(Resona decision notice)
 

Site visit, status of after N-ren Project


[ September 04, 2022 ]

One of our members visited the site from September 3rd to 8th, 2022. Entry into Cambodia is now almost back to the situation before the outbreak of the infectious disease (COVID-19), issuance of arrival visas at the airport, online visa issuance has started, and we have three or more vaccination certificates With that, we were able to travel unconditionally. From September 3rd to 8th, the members visited the site and confirmed the operation of the N-ren project and the current state of the facility. Due to the heavy rain in the rainy season, some slope failures were observed, but the facility continued to function and was effective. In addition, the surrounding Slaem district, including the local eco-village, has regained its vitality, new guest houses have been opened, and the latest coffee shops have been opened.  

new guest house
(New guest house)

The townscape at the entrance of the eco-village
(The townscape at the entrance of the eco-village)

Old reservoir of the ecovillage
(Old reservoir of the ecovillage)

Main road in ecovillage
(Main road in ecovillage)

ADB's new project signboard (community-based tourism project development)
(ADB's new project signboard (community-based tourism project development))

Cultivation in a local greenhouse
(Cultivation in a local greenhouse)

Reservoir construction in the N-Ren project
(Reservoir construction in the N-Ren project)

NAPV dormitory that manages the eco park
(NAPV dormitory that manages the eco park)

Banana trees today from a former tree planting project
(Banana trees today from a former tree planting project)

Pond by N-Ren project (full of water in rainy season)
(Pond by N-Ren project (full of water in rainy season))

Security and facility management house
(Security and facility management house)

Security and facility management house 2
(Security and facility management house 2)

 

Submission of 2022 activity report to Tokyo Metropolitan Government


[June 29, 2022]

The 2022 activity was approved at the 2022 General Assembly meeting, we submitted the activity report and other related materials to the Tokyo Metropolitan Government.  

Receipt by Tokyo Metropolitan Government
(Receipt by Tokyo Metropolitan Government)
 

The Board of Directors will be held in June 2022, and a new director will be appointed.


[June 25, 2022]

The new directors were approved at the 2022 General Assembly Meeting, and the responsibilities of each director were decided at the subsequent regular board meeting.  

New director
New director(PDF)  

2022 General Assembly


[June 25, 2022]

The 2022 General Assembly Meeting was held on June 25th. The General Assembly Meeting was held both face-to-face at the Ochanomizu office and by ZOOM.  

General meeting materials
General meeting materials(PDF) GAM Minutes
GAM Minutes(PDF)  

Green donation "Support project by SDGs contribution limited use donation" End of donation


[June 01, 2022]

The green donation "Support project by SDGs contribution limited use donation" has been completed. Until May 31st, we were selected as a project to donate and were accepting donations, but unfortunately our project did not reach our goal. I would like to continue to challenge the autumn recruitment! !!  

End of donation for support project
(End of donation for green donation support project)
Map of support project
(Map of green feather campaign support project)
Results of donations
Results of donations(PDF)  

Aeon environment project completed


[March 31, 2022]

Travel was restricted under Covid-19, but thanks to the efforts of the local people, the AEON Environmental Activity Grant Project has been completed!  
Procurement of seedlings
(Procurement of seedlings)  
 
Tree planting activities
(Tree planting activities)  
 
Water supply management
(Water supply management)  
 
Studying the environment (ZOOM meeting)
Studying the environment (ZOOM meeting)  
Final report
Final report(Only Japanese)(PDF)  

Newsletter No. 4


[February 15, 2022]

The newsletter, which had been suspended for a while, has been resumed.  

>Newsletter No. 4
(>Newsletter No. 4) >Newsletter No. 4(Only Japanese)(February 2022)(PDF)  


[February 01, 2022]

The tree-planting activities of our association have been nominated for the "Support Project by SDGs Contribution Use Limited Fundraising" by the National Land Afforestation Promotion Organization. Until May 31st, the project is eligible for green donation as an SDGs support project. Please notify the companies, organizations, and individuals you know. Of course, we are also looking forward to your donations. (sdgs3-0403)  

Support project
(Green feather campaign support project) https://www.green.or.jp/bokin/crowdfunding/sdgs3-0403

 

[December 15 2021]

In the dry season, the growth speed of crops is increasing day by day. Tree planting by the AEON Environmental Project started on December 15th. The first is weeding and leveling work.
Growing vegetables 1
(Growing vegetables 1)  

Growing vegetables 2
(Growing vegetables 2)

Video conference participants
(Video conference participants)

Tree planting site leveling
(Tree planting site leveling)

Spring planting seedlings after weeding 1
(Spring planting seedlings after weeding 1)

Spring planting seedlings after weeding 2
(Spring planting seedlings after weeding 2)

Spring planting seedlings after weeding 3
(Spring planting seedlings after weeding 3)  

Spring planting seedlings after weeding 4
(Spring planting seedlings after weeding 4)

After land preparation at the tree planting site
(After land preparation at the tree planting site)
 

[November 20 2021]

The water festival holiday from November 18th (Thursday) to November 20th (Saturday) has ended, and the dry season has begun. Tourists visited us during the water festival holidays! !!
Reservoir full of water 1
(Reservoir full of water 1)  

Reservoir full of water 2
(Reservoir full of water 2)

Reservoir full of water 3
(Reservoir full of water 3)

Growing crop 1
(Growing crop 1)

Growing crop 2
(Growing crop 2)

Tourist visit
(Tourist visit)
 

[October 30 2021]

October is the end of the rainy season. Due to heavy rain every afternoon, the test cultivated area is flooded and the reservoir is also full.
Reservoir in the rain
(Reservoir in the rain)  

Filled reservoir
(Filled reservoir)

Filled reservoir and drainage channel
(Filled reservoir and drainage channel)

October 30 Planting Report 1
(October 30 Planting Report 1 )

October 30 Planting Report 2
(October 30 Planting Report 2)
 

[September 29 2021]

The 6th International Coordinating Committee for Preah Vihear (ICC-PV) Conference was held in Phnom Penh on September 29th by the ZOOM Meeting, sponsored by the Government of Cambodia and UNESCO. At the meeting, the Preah Vihear Authority reported on the progress of the N-ren project, and the organizer, Dr. Phoeurng Sackona, Minister of the Ministry of Culture and Fine Arts of the Kingdom of Cambodia, thanked the Government of Japan.
ICC Conference Program
(ICC Conference Program )  

ICC meeting venue
(ICC meeting venue )

Greetings from NAPV Secretary General
(Greetings from NAPV Secretary General)

Project description slide
(Project description slide)

Construction work slide
(Construction work slide)

Project period explanation
(Project period explanation)

N-ren local project photo
(N-ren local project photo)

Minister thanking the Government of Japan and the Association
(Minister thanking the Government of Japan and the Association)
 

[September 24 2021]

This is the final report. The status of trial cultivation in the field was reported on September 24th.
Monthly report September cover
(Monthly report September cover )  

September 24th ZOOM meeting
(September 24th ZOOM meeting)

September planting status
(September planting status )
 

[September 15 2021]

Report the status of trial cultivation in the field to the Embassy of Cambodia. (August 31st) An outbreak of COVID-19 occurred at the market in Slaem village adjacent to the eco-village, and the lockdown (designated red zone) of Slaem village including the market was announced from the latter half of June and was lifted on July 18. However, in Slaem village, the number of infected people continued to increase, and on July 29, the red zone designation (lockdown) was announced again, and it was postponed until September 3. At the same time, an emergency response was issued in the ecovillage area, and as in Slaem village, each family refrained from going out and gathering, and the WEB meeting in August was attended only by members with a WIFI environment.
Monthly report August cover
(Monthly report August cover )  

August 30 ZOOM meeting
(August 30 ZOOM meeting )

August 30 harvest
(August 30 harvest )
 

[August 20 2021]

President Morita received the 2020 Foreign Minister's Commendation for his support for Cambodia, including many years of association activities.
https://www.mofa.go.jp/press/release/press6e_000321.html

Selection result
(Selection result )  

Foreign Minister's Certificate of Commendation
(Foreign Minister's Certificate of Commendation )
 

[August 15 2021]

Reported the state of trial cultivation in the field to the Embassy of Cambodia. (July 31st)
Monthly report July cover
(Monthly report July cover )  

July 30th ZOOM meeting
(July 30th ZOOM meeting )

July 24 Growth situation
(July 24 Growth situation )
 

Completion of the third contract condition change for Project


[July 22, 2021]

COVID-19 hit the eco-village directly, and the area including the market was designated as a red zone (prohibition of entry and exit, business suspension such as market, prohibition of resident going out) from the end of June 2021, and shipping is not possible. have become. Despite the fact that the harvest from the trial cultivation has been obtained, it cannot be distributed in the market. The red zone was lifted on July 19th, but the market remains quiet. We have applied for and consented to a two-month postponement of the business period until September 14, which will give us an outlook for market distribution. I would like the farmers who cooperated with me to learn how to sell in the market.
July growth situation 1
(July growth situation 1 )  

July growth situation 2
(July growth situation 2)

Photograph of the reservoir in July
(Photograph of the reservoir in July )
 

Submission of 2020 Project Report (Activity Report)


[July 15, 2021]

The activity report for 2020 was submitted to the Tokyo Metropolitan Government on July 21st.
1 Activity report
2 Activity statement
3 Balance sheet
4 Property inventory
5 Annual list of officers for the previous business year (Reiwa 2nd year)
6 A list of 10 or more employees on the last day of the previous business year (Reiwa 2nd year)
(Business report, activity statement, balance sheet, property list are posted in PVAJ Corporate Information.)
Submission of business reports, etc.
(Submission of business reports, etc. )  
 

NGO Cooperation Grant-in-Aid (N-ren) Project Report (Trial Cultivation)


[July 15, 2021]

Reported the status of trial cultivation in the field to the Embassy of Cambodia (June 30). Sales on May 29 were 87 kg and were worth 35.5 USD.
Crop yield and selling price
("Crop yield and selling price)  

Monthly report cover June
(Monthly report cover June )  

June 30 report photo
(June 30 report photo )  

June 30 growth photo
(June 30 growth photo )  
 

2021 General Assembly


[June 26, 2021]

The 2021 Annual Meeting was held at the ZOOM Meeting on June 26th. The activity report for 2020 and the activity plan for 2021 were proposed and approved.
ZOOM meeting 1
(ZOOM meeting 1)  

ZOOM meeting 2
(ZOOM meeting 2)  

Cover of General Assembly Proposal
Cover of General Assembly Proposal )  

General meeting proceedings
(General meeting proceedings )  

General meeting invitation
(General meeting invitation )  
 

NGO Cooperation Grant-in-Aid (N-ren) Project Report (Trial Cultivation)


[June 15, 2021]

We reported the situation of trial cultivation in the field to the Embassy of Cambodia. (May 31st) (1) Planting Eight types (tomato, water spinach, Brussels sprouts, pepper, cabbage, eggplant, rape blossoms, mustard greens) were selected from each farmer's request for planting, and F1 species were secured, and the test was conducted from March. For trial cultivation, the procedure is to clear the farmland, determine the planting range, maintain an insect repellent net, and plant seeds. After that, water management and fertilization were carried out. Some test farmers replanted seeds in May due to insect feeding damage (3 farms). The five farmers have been cultivated smoothly, and in mid-May, they shipped and achieved good sales results in consultation with neighboring markets. (2) Local meeting We held two web conferences on May 17th (scheduled for May 15th, but changed to 17th due to a local holiday) and May 30th. From the field, reports on planting and growth conditions, changes due to water supply, etc. were reported.
Activity report May
(Activity report May)  

May 30 Meeting Report
(May 30 Meeting Report)  

May 30 Farmer Report
(May 30 Farmer Report )  
 

Completion of the second contract condition change for Project


[June 11, 2021]

Preah Vihear Ecovillage is a remote area of Cambodia, but due to the influence of COVID-19, the project period has been extended until July 24, but at the same time, we applied for a change in the recombination of project funds. Due to the change in the period, it is expected that the local labor cost and planting test cost will change.
Contract Condition Change approval notice
(Contract Condition Change approval notice)  
 

The site is full of harvest


[May 30, 2021]

Two and a half months have passed since the start of planting, and some of them have achieved excellent growth. And some of them were put on the market in the neighborhood and sold. It's becoming a huge success. In the future, we will summarize the growth amount, shipping amount, and sales amount of each type locally.
Growing crop 1
(Growing crop 1 )  

Growing crop 2
(Growing crop 2)  

Growing crop 3
(Growing crop 3)  

Growing crop 4
(Growing crop 4)  

Crop growth record
(Crop growth record)  
 

Good growth


[May 05, 2021]

Vegetables are growing well. Insects have also seen feeding damage in some areas, but overall it is doing well. From May, we will take regular photographs so that participants can check the progress of the trial cultivation.
Insect feeding damage
(Insect feeding damage)  

Growing crop 1
(Growing crop 1)  

Additional planting
(Additional planting)  

Growing crop 2
(Growing crop 2)  

Growing crop 3
(Growing crop 3)  

Crop growth record
(Crop growth record)  
 

Remote meeting (test cultivation)


[April 30, 2021]

The Japanese side has entered Golden Week, but the work continues on the spot, and the remote meeting once every two weeks is held as scheduled. One month has passed since the planting in March, and some lush vegetables can be seen.
State of ZOOM meeting 1
(State of ZOOM meeting 1)  

State of ZOOM meeting 2
(State of ZOOM meeting 2)  

State of ZOOM meeting 3
(State of ZOOM meeting 3)  

Local crop growth 1
(Local crop growth 1)  

Local crop growth 2
(Local crop growth 2)  

Local crop growth 3
(Local crop growth 3)  
 

Remote meeting (test cultivation)


[April 19, 2021]

Khmer New Year is over and we are starting a remote meeting with the locals. During this time, there was an interval of two weeks, but the farmers' energy came back to life.
State of ZOOM meeting
(State of ZOOM meeting)  

Local ZOOM meeting
(Local ZOOM meeting )  

Local ZOOM meeting
(Local ZOOM meeting )  
 

Tree planting management (water supply)


[April 04, 2021]

Khmer New Year will start soon. During the New Year, everyone will be on holiday, and the fields and parks will be closed for water supply. Water supply management was carried out just before the holidays.
Water supply status
(Water supply status)  

Water supply pipe
(Water supply pipe)  

Tree water supply
(Tree water supply)  

Tree water supply
(Tree water supply)  

Water supply pipe management
(Water supply pipe management)  

Water supply pipe check
(Water supply pipe check )  
 

Remote meeting (test cultivation)


[March 30, 2021]

With the progress of trial farming in the eco-village, with the aim of success, weekly confirmation by local members, sharing of problems at the video conference connecting Japan and the local area every other week, and consideration of solutions have begun.
ZOOM meeting Tokyo - Local
(ZOOM meeting Tokyo - Local)  

ZOOM meeting-Document
(ZOOM meeting-Document)  

ZOOM meeting-participant
(ZOOM meeting-participant)  

ZOOM meeting-participant
(ZOOM meeting-participant)  

ZOOM meeting-participant
(ZOOM meeting-participant)  
 

Tree planting management and additional tree planting


[March 18, 2021]

The site is in the middle of the dry season, which is the hottest season of the year. Many of the trees that have been planted since December are growing well. Regular watering management keeps each tree healthy.
Tree planting and leveling work
(Tree planting and leveling work )  

Watering after tree planting by students
(Watering after tree planting by students )  

Tree planting work
(Tree planting work)  

Tree planting work
(Tree planting work)  

Tree planting seedlings
(Tree planting seedlings )  

Tree planting seedlings
(Tree planting seedlings )  
 

Start of test cultivation


[March 04, 2021]

Finally, the preparations for test planting were completed, the land for the test cultivated area was leveled, the insect repellent net was prepared, and sowing was started according to the wishes of each farmer.
Water supply pipe
(Water supply pipe )  

Planting test site
(Planting test site )  

Crop test set
(Crop test set )  

nsect repellent net construction
(nsect repellent net construction )  

With planting test set
(With planting test set )  
 

Preparation for test cultivation


[Februaly 23, 2021]

Construction of a reservoir and laying of water supply pipes have been completed, discussions with farmers participating in the test have been completed, and preparations for test cultivation are underway. We secured the fertilizer, water tank, and insect repellent net required for the test for the participating farmers.
Organic fertilizer
(Organic fertilizer )  

Insect repellent net
(Insect repellent net )  

Loading for transfer
(Loading for transfer )  

Water storage bottle
(Water storage bottle )  

Insect repellent net
(Insect repellent net )  
 

Maintenance after planting trees in the park (water supply, selection of additional seedlings)


[Februaly 19, 2021]

Some of the saplings planted in December are short of water and have some wilting. However, other tree plantings are growing well due to the effect of water supply. We plan to plant additional trees in March.
After planting
(After planting )  

White plumeria
(White plumeria )  

Plumeria
(Plumeria )  

Bougainvillea
(Bougainvillea )  

Additional seedlings
(Additional seedlings )  

Additional seedlings
(Additional seedlings )  
 

Performing cultivation tests in the dry season


[Februaly 15, 2021]

Water resources and water supply facilities in the dry season have been improved, and it has become possible to grow agricultural products even in the dry season. Volunteer farmers started a water utilization organization, conducted cultivation tests, and started discussions so that they could pave the way for income.
(1) Water utilization organization
89 person from farmers in the water supply planning area (25ha) participated, one leader and three sub-leaders were elected, and the "Agricultural Water Use Team Regulations" were established, and the participants unanimously agreed.
Water usage rules
(Water usage rules )  
Water use team
(Water use team member)  
Water utilization association
(Water utilization association)  
(2) Discussion of test cultivation rules
For the trial cultivation, the following plans were put together in response to requests from each farmer.
1) Distribution of organic fertilizer for test cultivation (compost fertilizer is self-made and commercial organic fertilizer is added)
2) Insect repellent net (80 or more)
3) F1 seeds for planting
4) Planting tank (200 liter water tanks are prepared in each field. Each water tank stores the required amount of water)  
Participating farmers 1
(Participating farmers 1 )  
 
Participating farmers 2
(Participating farmers 2)  

The following F1 seeds for planting were selected based on the requests from the test participants.
① Bok choy,
② Tomato,
③ Mini tomato 、
④ Water spinach,
⑤ Radish,
⑥ Chili pepper,
⑦ Chinese cabbage 、     
⑧ Canola flower,
⑨ Mustard greens
At the request of each farmer, select 2 to 3 types and perform a cropping test.
①Bok choy seeds
(①Bok choy seeds )  
②Tomato seeds
(②Tomato seeds)  
③Thai eggplant seed
(③Thai eggplant seed )  
④Water spinach seeds
(④Water spinach seeds )  
⑤Radish seed
(⑤Radish seed )  
⑥Chili seeds
(⑥Chili seeds )  
⑦Chinese cabbage seeds
(⑦Chinese cabbage seeds )  
⑧canola flower seeds
(⑧canola flower seeds)  
⑨Mustard greens seeds
(⑨Mustard greens seeds)  
 

Operates a technology transfer seminar aimed at preserving the local environment


[January 29, 2021]

We held a technology transfer seminar centered on people who are engaged in agriculture in ecovillages, with the goal of creating soil with an emphasis on the environment and community development. The lecturers are Mr. Oga of Thai Harmony Life Co., Ltd., which is engaged in environmental creation and agriculture centered on organic fertilizers, and Professor Kiyohide Tojo, who is engaged in research on regional development to reduce the environmental load from Japan to Tokyo University of Agriculture and Technology. We asked Professor Takeshi Fujino of Saitama University, who is engaged in research on the theme of soil preparation that preserves the environment and the natural environment. With easy-to-understand explanations from each teacher, participants requested that they practice it immediately, and in the afternoon of the day, soil making and compost making were practiced.
Seminar program
(Seminar program )
Seminar venue
(Seminar venue )
participant
(participant)
lecturer
(lecturer )
On-site training
(On-site training)
compost
(Compost production )  
The results of the questionnaire to the participants were as follows.

Questionnaire result 1
(Questionnaire result 1 )
Questionnaire result 2
(Questionnaire result 2)
Questionnaire result 3
(Questionnaire result 3)
Questionnaire result 4
(Questionnaire result 3)
 

Members of the Embassy of Japan in Cambodia visit the site


[January 27, 2021]

The person in charge of this project of the Japanese Embassy visited the site. They confirmed the construction of a reservoir, the installation of water storage tanks and solar pumping equipment for water distribution, and the installation of water distribution equipment in the fields. They commented on safety and facility maintenance management methods, and commented that they are looking forward to future technology transfer, trial cultivation efforts, and ensuring results.
Reservoir embankment
(Reservoir embankment )  

Solar power generation equipment
(Solar power generation equipment )  

Water intake equipment
(Water intake equipment )  

Visiting members
(Visiting members )  

Intake channel
(Intake channel )  
 

Association activity report (April 2019-March 2020) distribution started


[December 31, 2020]

Although it was late due to the influence of Covid-19, the activity report summarizing the association's 2019 activities could be printed and distributed. (only Japanese)
Association Activity Report (April 2019-March 2020) (PDF)

 
 

Published the Fall 2020 issue of PVAJ public relations magazine


[December 31, 2020]

The third PVAJ public relations magazine (Autumn 2020) has been completed. It is full of local Project topics. Completion of an agricultural pond in the autumn sky。
Public Relations Magazine No. 3 (Autumn 2020) (PDF)

 
 

Toyota Environmental Activities Project Report (Holding of Tree Planting Festival)


[December 19, 2020]

A tree-planting festival was held mainly in the eco-park. There were 60 participants with the cooperation of ecovillage residents and schools. We planted trees in the vicinity of the completed agricultural pond. We look forward to a beautiful park in a few years! !!

(Tree planting festival)  

(Commemorative tree planting 1)  

(Commemorative tree planting 2)  
 

Toyota Environmental Activities Project Report (Preparation for Tree Planting Festival, Purchase of Saplings, Tree Planting Plan, Information for Participants)


[December 12, 2020]

A tree-planting festival will be held on December 19th. The tree-planting festival information pamphlet and signboard have also been designed and completed. Seedlings used for tree planting are also secured in Siem Reap and Preah Vihear Province. Tree planting will be carried out on 3 hectares in the eco park. We are preparing for the participation of ecovillage residents and children.

(Tree planting area map)  

(Installation signboard)  

(Saplings for delivery)  

(Sapling 1)  

(Sapling 2)  
 

NGO Cooperation Grant Aid (N Ren) Project Report (Water Distribution Pipe Construction)


[December 07, 2020]

After the construction of the pond, the construction of the 2.5km water distribution pipe has finally begun. In cooperation with villagers who dream of agriculture in the dry season, PVC pipes connected to the tanks of the pond will spread! !!

(Water distribution pipe, tank outlet)  

(Drainage pipe construction 1)  

(Drainage pipe construction 2)  

(Drainage pipe construction 3)  

(Drainage pipe construction 4)  
 

Toyota Environmental Activities Project Report (Survey on Tree Planting Sapling Purchase)


[ 2020年11月25日 ]

We visited a sapling shop in Siem Reap to secure good quality saplings to be planted this year. We confirmed saplings for forests (this is a sapling shop in Preah Vihear Province), crape myrtle for making roadside trees, golden showers, Kaenju, etc.

(Pot sapling)  

(Sapling 1)  

(Sapling 2)  
 

NGO Cooperation Grant Aid (N Ren) Project Report (Pipe construction final placement confirmed)


[November 23, 2020]

We have adjusted the layout of the main canals to ensure that agricultural water reaches the farmers who cooperate with the local planting test in the dry season. The total extension of the original plan remains the same, but the position has been revised. A branch pipe is also installed every 100m.

(Yellow dotted line: water pipe plan)  

(Red: Water pipe final diagram)  
 

Toyota Environmental Activities Project Report (Preparation for planting festival, signboard design)


[November 15, 2020]

The tree-planting festival was originally scheduled for July, but it was changed to November or December due to a warning from the government to avoid gatherings of more than 20 people due to Covod-19 infection. The design of the information pamphlet and signboard for this tree planting has been decided.

(Tree planting festival venue)  

(Pamphlet for holding a tree-planting festival))  

(Tree planting festival signboard design)  

(Tree planting festival signboard Instartion)  
 

NGO Cooperation Grant Aid (N Ren) Project Report (Water Storage Tank Stand, Solar Panel Stand Construction Work)


[November 12, 2020]

On-site installation work for the water storage tank and solar pump system secured at the end of October has begun. Two 5000 liter tanks will be installed around the pond, and a solar pump capable of pumping up to 300 liters per minute will be installed from the reservoir. Many ecovillage residents will participate and the facilities will be completed.

(Solar panel stand)  

(Water tank stand 3m high)  

(Overview of the water tank stand)  

(Construction work)  

(Water storage tank)  

(Tank installation)  

(After installing the water storage tank)  

(Facility warehouse and facility for monitoring)  
 

Toyota Environmental Activities Project Report (Preparation for Planting Festival)


[November 07, 2020]

Discussions between PVAJ and NAPV regarding tree planting festivals and tree planting this year have begun. Since the tree planting scheduled for July in the rainy season has changed since November, how to proceed with curing in the dry season (mainly watering and weeding), selection of tree species that are resistant to water shortages to survive the dry season, future We talked about the selection of tree species that will be the symbol of the ecovillage.

NGO Cooperation Grant Aid (N Ren) project report (Start of intake channel construction)


[November 03, 2020]

The intake channel to the reservoir was 2m wide and 2.5m deep and was excavated along with the construction of the reservoir, and a water wheel was constructed to take water into the reservoir. A Japanese-style water wheel has been completed in Cambodia. It seems to be the center of tourism. The water wheel has a diameter of 4 m and has 32 boxes of 4 liters, which can pump 128 liters in one rotation. The plan is to pump 384 liters per minute (1 revolution in 20 seconds).

(Intake point)  

(Waterway 1)  

(Waterway 2)  

(Human power excavation of waterways)  
 

(Installation of water wheel 1)  

(Installation of water wheel 2)  

(Overview of the water wheel)  
 

Toyota Environmental Activity Project Report (Preparation for Tree Planting)


[October 26, 2020]

The original plan was to plant trees at the start of the rainy season in June-July, and to cure in the rain during the rainy season, but due to the effects of the new infectious disease, local activities became difficult, so tree planting festival and tree planting activities by villagers have been postponed to November or December. Trees will be planted in the dry season, and it will be important for the villagers to carry out curing activities such as further watering management. For this reason, the tree planting area will be moved from the original plan to a narrow area. We hope that a beautiful forest will be created in the eco-park together with the villagers.

(Farmer visit 1)  

(Farmer visit 2)  

(Farmer visit 3)  

(Farmer visit 4)  

NGO Cooperation Grant Aid (N Ren) Project Report (Pond construction completed)


[October 20, 2020]

The reservoir construction, which started at the end of August, was completed, and a large-scale agricultural reservoir was completed. Water in the latter half of the rainy season is accumulated in the pond. This water makes it possible to grow abundant crops in the dry season. The water that the villagers of the ecovillage have been waiting for has been obtained. In the future, a solar system that operates a pump and a water storage tank that guides water to each field will be installed, and water will be distributed to each field after waiting for the completion of the distribution pipe. We hope to invigorate the new village.

(Completion inspection measurement)  

(Completion inspection)  
The scale of the pond is completed as planned!  
 

(Shooting from the sky with a drone)  

(Reservoir scenery from afar)  

(Reservoir scenery from adjacent land)  
 

NGO Cooperation Grant Aid (N Ren) Project Report (Groundbreaking Ceremony Held by Local Residents)


[ September 04, 2020 ]

The on-site construction of the N-ren project by the Ministry of Foreign Affairs of the Japanese government has finally begun. The excavation of the pond has started after the ground leveling work in the construction area, which started in mid-August. The villagers of the ecovillage also gathered at the groundbreaking ceremony to celebrate the successful completion of the construction, as the long-awaited availability of water for dry season agriculture was imminent.

(Commemorative photo of the start of construction)  

(Volunteers)  
The villagers of the ecovillage are also looking forward to securing water in the dry season!  
 

(Construction site)  

(Project signboard design)  

(Project signboard)  
 

Toyota Environmental Activity Grant Program Progress Report


[ August 28, 2020 ]

Regarding the tree planting plan, the final plan was finalized by meeting with the NAPV (National Authority for Preah Vihear). Aiming to create a "beautiful forest" 10 years ahead, based on the plans of flower garden park, forest park, and fruit park.

(Overall plan and tree planting plan area for this year)  
Tree species: Koki (Dipterocarpaceae, local name: Hopea, Lauan), Menga (Teak), Kelangii (Rosewood), Tabekner (Cercus spp.), Golden Shower, Jacaranda, etc. In addition, the villagers of the eco-village have proposed to grow mango, papaya, star apple (star fruit) and cacao trees in the orchard.  

(Koki tree)  

(Menga tree)  

(Keranji tree)  

(Tavekuna Tree)  

(Golden shower tree)  

(Jacaranda tree)  

(Image after completion)  

(Landscape with trees and benches)  
 

NGO Cooperation Grant Aid (N-ren) Project Report (Start of land leveling in the reservoir area)


[ August 17, 2020 ]

Currently, there is a delay of two and a half months compared to the initial plan of construction in June. However, work has finally begun to start the construction. In order to treat the excavated soil and the area where the reservoir will be constructed, the area of around 5ha has been cleared.

(Leveling of reservoir planning area, part 1)  

(Leveling of reservoir planning area, part 2)  
 

NGO Cooperation Grant Aid (N-ren) Project Report (Final Plan)


[ August 15, 2020 ]

In consideration of the construction method and construction period on site, we have finalized the final plan including related projects and confirmed it with NAPV. From the reservoir, water will be supplied to the farmland where cultivation tests will be conducted in the dry season, and water will also be supplied to the flower garden park, forest park and fruit park, which are planned in the surrounding area by another project. It was planned that all the people in the eco-village would create a "hometown forest and park".

(Current of intake river)  

(Current of the planned site. Drone shooting)  
The waterway from the river to the reservoir will be an old natural stream. Since there is no electricity in the area, we plan to use a traditional water wheel to draw water from the river.  
 

(Water wheel example 1, Cambodian style)  

(Water wheel example 2, Japanese Design)  

(Example of natural small waterways, Japan)  
 

NGO Cooperation Grant Aid (N-ren) Project Report (Assigned to a Representative)


[ August 12, 2020 ]

いFinally, the representative, Mr. Watanabe, has left Japan. We prepared all the acceptance conditions on the Cambodian side such as PCR test, negative certificate of infectious disease, insurance coverage while on-site, bank deposit ($ 2,000) on arrival, and headed for Narita → South Korea Incheon → Phnom Penh .. After arriving in Phnom Penh, he immediately moved to a government-designated hotel, waited for quarantine, performed a PCR test on the 13th, and confirmed that all passengers on the plane were negative on the 14th. He moved to Siem Reap on the project car and was on standby for 14 days to confirm safety.  

Toyota Environmental Activity Grant Program Progress Report


[ July 03, 2020 ]

Submitted the project interim report. The project started in January reached the middle point in June, but due to restrictions on travel to Cambodia, tree planting festivals and tree planting cannot be carried out.

[Initial plan]
January: Organized by the executive committee (20 district representatives, 4 public institutions)...Jan.16 completed
February: Implementation plan prepared by the executive committee (public information on tree-planting festival)・・・Feb.26 completed
March: Study session planning (environmental management and tree planting management)・・・Mar.15-20 Conducted locally
March: Tree-planting festival planning (tree-planting area formulation, seedling planning)・・・Mar.21-23 Planning discussion with local members (remote)
April: Preparation and holding of the first study session (preparation of materials, preparation of public relations information)...Not implemented (postponed)
April: Preparation of materials for tree planting festival. Confirmation of tree-planting festival site: ・・・Mar.25-Apr.5 to have TV member meeting, others not held (postponed)
May: Land leveling (weeding) in the tree planting area, public relations activities (pamphlet/poster distribution), TV station/newspaper conference・・・Mar.25-Apr.5 Discussion. However, canceled due to infectious disease, others not implemented (postponed)
June: Tree planting festival scheduled (opening ceremony, greetings from the guests and sponsors, commemorative photo, tree planting start, closing ceremony), planting signboard installation...not implemented (postponed)
June: Implementation of tree management: not implemented (postponed)  

NGO cooperation grant aid (N-ren) project report (preparation for construction work)


[ July 25, 2020 ]

The start of the project has been delayed due to the impact of new infections. Mr. Watanabe, an expatriate employee, is now returning to Japan and waiting for his trip while considering the situation in Cambodia. We are proceeding with discussions with the locals and plan to go to the locals in August. With the locals, we are discussing with people of NAPV (National Authority of Preah Vihear) by e-mail, LINE, and video conference, and we are preparing to build the reservoir from July.

(Reservoir construction example 1 by construction company)  

(Reservoir construction example 2 by construction company)  

2020 General Assembly Meeting


[ July 18, 2020 ]

This year, the General Assembly Meeting, which was normally required to be held by the end of June within 3 months from the closing date, has been postponed by the Cabinet Office until July 31 due to the impact of the new infectious disease. It was PVAJ also switched to working from home after March. The General Assembly Meeting was held in the meeting room of "JICA Global Plaza" on Saturday, July 18th, after the government's declaration of emergency was lifted. No. 1 Agenda: 2019 Business Report and Activity Results No.2 Agenda: Appointment of Officers, Duties and Compensation Both Agendas have been approved. Kimura Yoshikazu was appointed as a new director at this General Assembly Meeting. Kimura is also an expert in international business, having been active in the Japan Export and Import Bank (JBIC), having been seconded to the Agency for Natural Resources and Energy and ADB, and having also been appointed as JBIC New Delhi Chief Representative.

(Picture of General Assembly Meeting)  

March financial report


[June 30, 2020 ]

The financial statements for 2019 have been completed. Last year, it was adopted by the Toyota Environmental Activities Grant Program and by the Japanese NGO Cooperative Grant Fund (N-Ren). Toyota business started in January and N-Ren started at the end of February. However, due to a new infectious disease problem, it became difficult to stay in the field from March, and the expatriate staff also returned to Japan, and the local staff are doing their best. The 2019 financial results will be confirmed and approved by the General Assembly Meeting on July 18.
2019 financial statements (PDF)


Toyota Environmental Activity Grant Program Progress Report


[ May 27, 2020 ]

The project period can be extended and changed from December 31, 2020 to March 31, 2021. Due to the influence of the new coronavirus, the progress of the project has been delayed, and the Toyota Environmental Activities Grant Program Secretariat has announced that the postponement will be accepted. Since our project has been delayed only by local staff since mid-March, we decided to apply.

Regular discussion with Eco Village farmars


[ February 28, 2020 ]

〇On February 28, the Preah Vihear Eco Village held an explanation to farmers and exchanged opinions on the projects implemented this year. In 2020, the Japanese NGO Grant Aid project will start securing agricultural water, establish a water management organization, promote dry season agriculture, and support environmental activities from Toyota Corporation (environmental education, tree planting activities, environmental awareness activities) We discussed about the plan. The exchange of opinions was attended by 30 villagers, including the mayor of the Eco Village and the Deputy Mayor, who offered many opinions and hopes for the project to be implemented. Finally, a full-fledged project began in the area, and the villagers who participated also expressed great expectations.
 

(Commemorative photo by attendees)  

Signing Ceremoney of Japanese NGO Grant Aid at Embassy


[ February 25, 2020 ]

〇. On February 25, 2020, at the multi-purpose hall in the Embassy of Japan in Phnom Penh, a “Reservoir Construction Project for Strengthening Agriculture in the Preah Vihear Eco-village Area” was signed between Ambassador Masahiro Mikami and our president Mr. Noritada Morita. At the signing ceremony, the Japanese NGO Grant Aid will also be jointly in charge of World Vision Japan (“Project for Improvement of Maternal and Child Health, Nutrition and Water Sanitation in Preah Vihear Province (1st year)”), Children without borders (“Youth Employment Support Project through Improvement of the Quality of Community Learning Centers (CLC) in Pailin, Cambodia (1st year)”). The signing ceremony, from the Cambodian side, attended by Parliamentarian Mr.Yala who supported our project, and Secretary General Mr.Puthikar from the Preah Vihear Authority, Deputy Secretary-General Mr.Sambat, Deputy Secretary Mr.Shinat, Mr. Som Cheath, and Mr.Yong Sophack. The Project period is one year from February 25, 2020 to February 24, 2021. We will construct three agricultural ponds in the eco-village eco-park to support agriculture in the dry season, and aim for production in the dry season next year cooperation with local farmers.
https://www.kh.emb-japan.go.jp/files/000571225.pdf


(Signing Ceremoney)  


(Ambassador Mikami and President Morita shake hands after signing)  

(Greetings from President Morita after signing)  

(Commemorative photo of Parliamentarian Mr.Yarra, President Morita, Ambassador Mikami)  

(Commemorative photo)  

Application for Ministry of Foreign Affairs “Japan NGO Grant Aid” approved


[ January 17, 2020 ]

〇 The Ministry of Foreign Affairs' International Cooperation Bureau is promoting a grant aid project to provide the necessary funds for economic and social development projects implemented by Japanese NGOs in developing countries and regions. We proposed an agriculture support project at Preah Vihear Eco Village for the 2019 project, and received its adoption. The proposal is to test the production of agricultural crops by supplying water to the test area of Eco Village during the dry season as a “reservoir construction project to strengthen agriculture in Preah Vihear Ecovillage Area”. Preah Vihear Eco Village has only a few millimeters of rain during the dry season (from November to April of the following year), and the land becomes dry from December, making agricultural production impossible. We communicated with about 50 households of 25ha on a trial basis, supplied water for agriculture from December to February, conducted trial farming, and planned activities to aim for agricultural harvesting. In this project, three reservoirs (40m x 50m x 3m, about 6,000m3 each) will be set up to supply water for three months. In April this year, the project will begin, and in March next year, the project will aim for agricultural harvest in the dry season.
https://www.mofa.go.jp/mofaj/gaiko/oda/about/shimin/page22_000886_00001.html


(Project planning area)  


(Plan view)  


(Facility plan drawing)  


(Facility cross-section plan)  


(Project planning meeting_Authority executive)  


(Project briefing meeting with residents_01)  


(Project briefing meeting with residents_02)  


(Participant group photo after project explanation)  

Preah Vihear Eco Park Now (January 2020)


[ January 15, 2020 ]

〇It is during the dry season. The fields are dry and the crops do not grow. However, vegetables grow in the greenhouse. Watermelon and cherry tomatoes grow with a little water supply, even in the absence of rain. In the dry season next year, we hope that we can harvest a lot in the fields...
https://global.toyota/en/sustainability/esg/challenge2050/challenge6/ecogrant


(Farmland in the Eco Park)  


(Dry field in dry season)  


(Growing vegetables in a greenhouse)  


(Watermelon caught in a greenhouse)  

Adopted for Toyota Environmental Activities Grant Program


[ December 03, 2019 ]

〇The Toyota Environmental Activities Grant Program subsidizes projects implemented by private non-profit organizations that aim to develop human resources who will be responsible for the next generation for environmental conservation and solve environmental problems. Toyota have received the “Global 500 Award” from the United Nations Environment Program (UNEP). In commemoration of that award, Toyota have been implementing a grant program since 2000 as part of their social contribution activities. The theme of the grant is “biodiversity”, “climate change”, and “manufacturing is human resource development”. Toyota support human resource development to solve environmental issues and practically contribute to project activities that contribute to solving environmental issues. In 2019, 26 proposals were adopted, and our proposal was selected as one of 26 proposals. Our activities will begin in January 2020 at Preah Vihear Eco Park.
https://global.toyota/en/sustainability/esg/challenge2050/challenge6/ecogrant


(Grant certificate)  


(Toyota Environmental Challenge 2050)
  

Selection result(PDF)

  

Application overview (Japanese)(PDF)

Preah Vihear Eco Park now


[ October 21, 2019 ]

〇 Agriculture begins in the dry season. Vegetable cultivation started in the greenhouse. This is the period until the beginning of December when rain can be expected even in the dry season. From December to February, there is almost no rain and crops do not grow. Securing water during this period is the key to agricultural expansion.


(Pigs have grown)  


(The vegetables are now)  


(Vegetables have grown)  


(Study session today)  


(In front of the office)  


(Farming has become fun)  

The English homepage has been revised


[ October 20, 2019 ]
〇English homepage has been released.
〇 We will also send information overseas including Cambodia and the local area.



(PVAJ English homepage)

PVAJ 10th Anniversary Seminar Material has been released


[ October 06, 2019 ]

〇 October 5, 2019 10th Anniversary Seminar “Preah Vihear Now and Now” is now available.
〇The past activity of NAPV is recorded. You can download it here.
 

(10th anniversary seminar materials)  
  

10th anniversary seminar materials(PDF)

PVAJ 10th Anniversary Conference was held


[ October 05, 2019 ]

〇PVAJ was established in April 2009, and 10 years have passed. In commemoration of this, a 10th anniversary conference was held in collaboration with the Japan Travel Writer Association Cambodia Group. We received support from the JICA Global Plaza and the Japan Travel Writer Association.
〇On the day of the event, a large number of participants in the JICA Global Plaza 600 Conference Room.
〇The conference began with greetings from President Morita and Vice President Kotani of the Japan Travel Writer Association. Afterwards, the former President Kato, had a lecture and then by the photographer Koji Okumura made lecture on the “World Heritage Preah Bihia Temple”, and after then commemorative lecture on “Cambodia Civil War and Now” was done by President Morita.  

(10th Anniversary Seminar “Program”)  


(10th anniversary seminar "Reception")  


(10th Anniversary Seminar “Venue”)  


(10th Anniversary Seminar “Message from President Morita”)  


(10th Anniversary Seminar “Vice President Kotani Greeting”)  


(10th Anniversary Seminar “Presentation by Former President Kato”)  


(10th Anniversary Seminar “Lecture by Photographer Mr.Okumura”)  

Publication of public relations magazine No.2


[ September 30, 2019 ]

〇 Public relations magazine No.2 was published.
〇 Village development in 2019 Initiatives for agriculture
〇2019 soccer class was held
〇 Eco park challenge (joint project)
(1) Sprinkler installation!
(2) Installation of a greenhouse!
(3) Meeting with the provincial agricultural department
 

(PVAJ magazine 2019 summer)  
  

PVAJ magazine 2019 summer(PDF)

Today’s Preah Vihear Eco Park


[ July 29, 2019 ]

〇 The construction of an additional aquaculture pond has been carried out locally.
〇 Pumpkin flowers bloom in the greenhouse, and the harvest is awaited.
〇 Water storage tanks have been added and maintained as water resource facilities, and are expanding.
〇 Active agricultural activities such as vegetable production and farmer study sessions are progressing.
〇 If the water problem in the dry season is solved, further development is expected.
 

(Drilling a new aquaculture pond 1)


(Drilling a new aquaculture pond 2)  


(Pumpkin flower bloomed)  


(Farming in the greenhouse)  


(Water was further enhanced)  


(The watering was done)  

Meeting with Preah Vihear government


[ July 15, 2019 ]

〇 PVAJ Secretary General visited Preah Vihear State Agricultural Department to discuss agricultural support in Eco Village and irrigation facility development project.
〇 Five people attended from the Agriculture Bureau, including the Director in charge of each department.
〇The government thanked the activities of PVAJ, and we will continue to cooperate closely, and we have agreed to continue discussions.
〇It was said that the Agriculture Bureau understands that the water problem (water shortage) in the dry season is particularly large and is considering countermeasures, and aims to establish organic agriculture.
〇The Agriculture Department already has experience in business cooperation such as the establishment of an agricultural cooperative with the support of the grassroots of the Japanese government, and thanks for the support from NGOs as well as the Japanese government.
 

(Agricultural Bureau meeting 1)


(Agricultural Bureau meeting 2)  


(Agricultural Bureau meeting 3)  

Reporting to Tokyo Metropolitan Government is completed


[ July 1, 2019 ]

O Following the resolution of the grand total, we reported the results of activities in 2018 to the Tokyo Metropolitan Government, which is an authorized organization of our association.
O The submitted documents are as follows and were successfully received.
1 Business Report
2 Activity Statement
3 Balance sheet
4 Property inventory
5 Annual list of officers for the previous fiscal year
6 Directory of 10 or more employees as of the previous fiscal year end
 

(Reciept by Tokyo Metropolitan Government)  

Publication of activity report


[ June 30, 2019 ]

〇 The 2018 activity report has been printed with the approval of the General Assembly.
〇 Business details, financial reports, and plans for FY2019 are shown.


(2018 activity report)  
  

2018 activity report(PDF)

The 11th general meeting was held


[ June 29, 2019 ]

〇The 11th general meeting was held on Saturday, June 29, 2019, at 14: 00-15: 00 in the JICA Global Plaza 603 meeting room in Ichigaya, Shinjuku-ku, Tokyo.
〇78% of the members including the power of attorney attended, the general meeting was formed, and the proposal was approved.
① Proposal No. 1: FY2018 Business Report and Activity Results
②Report items
1) FY2019 Business Plan (Draft)
2) FY2019 Budget Plan (draft)

Today's Preah Vihear Eco Park


[ April 22, 2019 ]

〇 The state in local eco-park arrived from the site.
〇 Fish (tilapia) in aquaculture pond has grown. Shipped! !
〇 With the profits of the aquaculture business, wells have been gradually developed in the village
〇The library is in progress at the school. But there are still not enough books. I would like to enrich old English books and old computers. We look forward to donating! !
 

(Tilapia)  


(Harvested)  


(Grew up! !)  


(School Library reception! !)  


(Books ready)  


(It's still free space! !)

Publication of public relations magazine No. 1


[ April 01, 2019 ]

The PVAJ magazine was published. “ Preah Vihear'' quarterly 2019 spring issue
〇New village started in 2018 Eco-village now
〇 2018 ICC Conference, New Eco Village Plan
〇 Eco Park now (joint project)
(1) Electricity came!
(2) A road has been created!
(3) The future of the village
 

(PVAJ magazine quarterly 2019 spring)
 

PVAJ magazine quarterly 2019 spring(PDF)

Holding a soccer class!!


[ 29,January,2019 ]

On January 29, 2019, former Futsal Japan national team captain Wataru Kitahara visited an elementary and junior high school in Eco Village to hold a charity soccer class. Kanto Salt Industry Co., Ltd., which is a member of this strengthening, SVOLME Co., Ltd., which handles sports brands such as uniforms, Polyvalent Co., Ltd., who manages professional athletes, Mervaille Co., Ltd., a communications human resources business, and Emgrit Co., Ltd., which handles insurance and consulting In response to consultations, etc., we visited an eco-park / eco-village in the local activity area of the association. Charity soccer was also reported in the Asahi Shimbun and Nikkan Sports Newspaper.
https://www.asahi.com/and_M/pressrelease/pre_639568/

 

(A professional soccer player! !)

(With Kitahara!!)

(Full of smiles)

(I got the ball)

Rehabilitation of irrigation system!!


[ 5,October,2018 ]

On November 1-5, 2018, we strengthened the water supply system for dry season water, which was an issue in tree planting activities at Eco Park. Up to now, water has been supplied only in the vicinity of the water supply tank, but additional tanks have also been repaired and replenished so that water can be replenished over a wide area. Agriculture is now possible! !
 

(Intake from well)

(Distribution network construction with PVC pipe)

(PVC pipe laying)

(Water supply tank)

(Solar power supply for intake pump)

(Be able to irrigate the field! !)

Project report for the second afforestation in 2018!!


[ November 01, 2018 ]

On November 1, 2018, three members from PVAJ stayed at the Preah Vihear Eco Park and planted trees with the residents.
http://www.green.or.jp/bokin/

 

(Second planting in 2018: Joint planting)

(2018 2nd tree planting: seedlings)

Electricity came!!


[ October 29, 2018 ]

In October 2018, finally, the electric village also passed through the Eco Village and you can use electricity! ! In addition, expansion work is progressing on the village main road. How many lanes are possible! ! On November 15, the association's local office was energized! !
 

(Electric poles were installed on the road and wires passed)

(Road before expansion (June): Eco Village)

(Road after expansion: Eco Village)

Report on attendance at ICC meeting in September 2018!!


[ September 20, 2018 ]

On September 20, 2018, the 4th ICC-Preah Vihear World Cultural Heritage Technology Conference (4th ICC-Preah Vihear) hosted by UNESCO and the Cambodian government was held in Siem Reap. It was.
https://www.information.gov.kh/detailnews/220213

 

(September 2018 ICC meeting)

(September 2018 ICC meeting)

(September 2018 ICC meeting)

(September 2018, Deputy Director of ICPV Conference NAPV)

(September 2018, Deputy Director of ICPV Conference NAPV)

(September 2018, Deputy Director of ICPV Conference NAPV)

Project report for the first afforestation in 2018!!


[ August 21-23, 2018 ]

From August 21 to 23, 2018, PVAJ conducted a forestation project for FY2018 at Preah Bihia Eco Park, including the participation of members. The 2018 project is also supported by the Central Fundraising Center Project of the National Land Afforestation Promotion Organization. This time, 18 villagers from Eco Village participated in the first planting, and a total of 200 trees were planted at Forest Park 100 and 100 fruit trees at Eco Park, including 3 members from Japan. I hope the greenery of the village will be expanded. The Association was attended by the Secretary-General and Mr. SomCheat and YongSophack from the local Preah Vihear Japan Association NGO.
http://www.green.or.jp/bokin/

 

(Tree planting in 2018: Tree planting commemoration)

(Tree planting in 2018: Tree planting activities)

(Tree planting in 2018: Tree planting jointly with local people )

(Tree planting in 2018: Tree-planting activity commemorative photo)

(2018 Tree Planting Management Study Session)

Member companies conduct field trips related to health care!!


[ August 17-25, 2018 ]

From August 17th to 25th, members of the association visited the Cambodia and visited Preah Vihear, and the association supported them. (9 days from August 17 to 25, accompanied by the Secretary-General)

Project report for the afforestation in 2017!!


[ June 25-28, 2018 ]

On June 25-28, 2018, we conducted a 2017 afforestation project at Preah Vihear Ecopark and others. This was continued in August 2017 and February 2018. This project is being carried out with the support of the Green Fundraising Central Project of the National Land Afforestation Promotion Organization.
http://www.green.or.jp/bokin/

 

(2017 tree planting commemoration)

(2017 tree planting: mowing under the grass, preparing for tree planting)

(Tree planting in 2017: Tree planting activities jointly with the community)

>Association phone number has changed


[ June 15, 2018 ]

Phone number will be changed. The new numbers are:  
Phone : 03-5259-5070, FAX : 03-5259-5073 (From June 19, 2018)

10th general meeting


[ June 02, 2018 ]

June 2, 2018 (Saturday) Location: JICA Global Plaza 601 conference room (Yubinbango162-8433 Shinjuku-ku, Tokyo Ichigayahonmura-cho 10-5 JICA Ichigaya in a building)

Resolutions
●Proposal 1
2017 Business Report and Activity Results
●Proposal 2
2018 business plan and income and expenditure budget (draft)
●Proposal 3
Changes of the Articles
●Proposal 4
Appointment of officers, duties and compensation
 

Summary of major resolutions
It has been confirmed that the system will be renewed from 2018, support for the local Preah Vihear Eco Village, Eco Park, and activities in the Preah Vihear area will be further developed. Approved
New Director: Masataka Nakamura (Former Auditor)  Former Dexia Credit Local Bank Tokyo Branch full-time advisor, current NPO Planet Finance Japan Executive Director and Secretary General      
New Auditor: Kei Sato (Former Director)   Association representative supporting former 4 ASEAN member countries (CLMV), former member of Japan Bank for International Cooperation      
New Director: Mr. Keigo Kobayashi      
President of Vantage Inc.

Report lecture
Following the general meeting, Mr. Koji Okumura, a member of the photographer, gave a lecture entitled “Report on Museum Opening Photo Exhibition (10th Anniversary of the Preah Bihji Temple World Heritage Site)” held in Preah Bihia in March.



New Board of Directors held after the general meeting
After the general meeting, a new board of directors was held, and director Tokutada Morita was elected as president, Yoshitaka Ina and Kazumasa Ito were elected as vice presidents. In addition, Mr. Kazumasa Ito was appointed as the new secretary general by the chairman. In addition, the Board of Directors continued to ask Mr. Tatsutoshi Tsunoda for counselor. From this fiscal year, it was confirmed that public relations activities would be strengthened, and it was also confirmed that Tetsuro Ito continued to cooperate as necessary.

9th general meeting


[ May 27, 2017 ]

May 27, 2016 Place: Ochanomizu Office

Resolutions
●Proposal 1
2016 business report
●Proposal 2
2016 financial statements (audit report, activity statement and notes, property inventory, balance sheet)
●Proposal 3
2017 business plan (draft)
●Proposal 4
2017 Business Accounting Balance Budget (Draft)
●Proposal 5
Appointment of Directors and Auditors in 2017

8th general meeting


[ May 28, 2015 ]

May 28, 2015 Place: Ochanomizu Office

Resolutions
●Proposal 1
Matters related to the 2015 business report (business report)
●Proposal 2
2015 financial statements (audit report, activity statement and notes, property inventory, balance sheet)
●Proposal 3
2016 business plan (draft)
●Proposal 4
2016 Business Accounting Balance Budget (Draft)
●Proposal 5
Appointment of Director / Auditor in 2016  

Summary of major resolutions
Two new grants were reported, and it was confirmed that the project in FY 2015, which was active under the name of “Pre-Abihia First Year”, was further developed, and one director was newly added.
New director: Kazumasa Ito      
Chief Engineer, International Diviion, Construction Technology Institute Co., Ltd. Visiting Professor, Department of Urban Engineering, Graduate School of Engineering, Tokyo City University

Summary of incidental approval matters
As a counselor for students in charge of updating the homepage, I decided to have Tetsuro Ito members cooperate as appropriate.

PVAJ activity are certified as an [international exchange program] by [Mitsubishi UFJ International Foundation] and received a grant.


[ 2016年5月19日 ]

The sincere activities of the student team and the activities of the PVAJ are recognized as an “international exchange program” by the Mitsubishi UFJ International Foundation, and receive grants. We will proceed to hold international conferences in Preah Vihear by young people from Japan, Cambodia and Vietnam.

Please refer to the website of Mitsubishi UFJ International Foundation.
http://www.mitsubishi-ufj-foundation.jp/



February 2016 PVAJ 12th Student Team “Spring Roll” Workshop In Tratan village (Vietnam) Exchange between Vietnamese youth and Japanese youth

Activity of PVAJ have been approved by the “Expo 2005 Aichi Japan, Achievement Subsidy Program” from the “Global Industrial and Social Progress Research Institute(GISPRI)” and received a grant.


[ 2016年3月8日 ]

The activities of PVAJ have been approved by the “Expo 2005 Aichi Japan, Achievement Subsidy Program” from the “Global Industrial and Social Progress Research Institute(GISPRI)”, and recieved a grant. Based on the subsidy, we will start supporting agriculture promotion and self-reliance activities by people in Preah Vihear area. To that end, we launched an ecotourism plan for developing regional leaders. In the future, we aim to contribute to ecotourism not only in Cambodia but throughout the Mekong Area.

Please refer to the website of the Global Industrial and Social Progress Research Institute(GISPRI). http://www.gispri.or.jp/link/index.html

Office was moved to Ochanomizu.


[ January 1, 2016 ]

■New address
2-4-4 Kanda Surugadai, Chiyoda-ku, Tokyo, 101-0062, 2nd floor, Meiji Shobo Building
TEL&FAX:03-5259-5070, FAX : 03-5259-5073

Partnership with [Motivation and Healthy Shinbashi Clinic]


[ November 1, 2015 ]


(Center: Dr. Mitsunobu Asato, Director)

For 11 years, Mr. Mitsunobu Asato, who has been involved in medical care and treatment at the emergency lifesaving center of Jichi Medical University Hospital, and has since been involved in all medical fields, said, “Encourage and energize everyone in Japan!” “Motivated and Genki Shinbashi Clinic” was launched on November 2 at a 30-second walk from Shimbashi Station.
The director, Mr. Mitsunobu Asato, wants to contribute to society, and through the association, 10% of the garlic injection cost will be donated to Cambodia.



HP: http://yarukigenki.jp

7th Extraordinary General Meeting


[October 20, 2015 ]

September 27, 2015 Kojimachi Office

Resolutions
●Proposal 1

New personnel
●Proposal 2
Preah Vihear International Establishment Preparation Office

The chairmanship and vice presidential office were abolished. Chairman Morita became the director, and President Kato became the director in charge of the Preah Vihear International Foundation. Preah Vihear International is an organization urgently established in response to the UNESCO meeting at the end of last year, and aims to be the center of the Japan Society. In addition, two new directors have been added.

New Director Kei Sato Director of the Japan Cambodia Association, former Japan Bank for International Cooperation
New Director Yoshikazu Yokoi, Facility and Manufacturing Equipment Designer

Opened a new office in Kojimachi!!


[ July 5, 2015 ]

Opened a new office in Kojimachi The opportunity for proactive business promotion has matured due to the settlement of the Preahabihia border dispute. We are also preparing to open a new office to strengthen the system.

■New office
6-1-10, Chiyoda-ku, Tokyo Sanyo Rokubancho Building
TEL&FAX:03-6256-8066

Office is well-located building with a 2-minute walk from Kojimachi Station, 5 minutes from Ichigaya Station and 8 minutes from Yotsuya Station.



Details will be announced later.

6th General Meeting!!


[ June 29, 2015 ]

May 30, 2015
Location: JICA Earth Plaza

Resolutions
●Proposal 1
The 2014 business report (business report)
●Proposal 2
2014 Financial Statements (Audit Report / Activity Statement and Notes / Property List / Balance Sheet)
●Proposal 3
Election of one director
Daisuke Asano was appointed as a successor director following the retirement of Tatsutoshi Tsunoda and Tsuneaki Yoshida
●Proposal 4
Appointment of one auditor Mr. Masataka Nakamura was appointed as the succeeding auditor of Kenji Tanaka's retirement

New Director: Daisuke Asano (Ministry of Economy, Trade and Industry, Agency for Natural Resources and Energy)
New secretary: Masataka Nakamura, former director of Mitsui Trust Bank, former Dessia Credit, full-time advisor to the local bank Tokyo branch

>A commemorative report meeting was held for student teams receiving the JICA Group Encouragement Award!!


[ 2015年06月29日 ]

On March 21, 2015, the report meeting was successfully completed.
At the 11th JICA Global Education Contest, a photo submission of the student team won the Group Encouragement Award, and a debriefing session was held at the JICA Global Plaza to commemorate this.

Greetings from UK Someth from Cambodia, activity report, award ceremony, panel discussion "Preah Vihear: One Step to the Future-The Way We Walked"
Moderator: Kazuya Endo (Kyodo News Editorial Committee and Editorial Writer)
Panelists: Daisuke Asano (Ministry of Economy, Trade and Industry) Yoshina Ninomiya (Nihon University 4th year) Noritada Morita (President of PVAJ)
Talk session-Two Olympic medalists
Satoko Takeuji, Yoko Tanabe
It was a great success with many people participating.

Group Encouragement Award

Amendment to the Articles of Incorporation has been certified!!


[ June 29, 2015 ]

Certification date November 11, 2014
Effective date November 13, 2014

The new Article will take effect from the date of receipt of the certificate.

5th General Meeting!!


[ 2015年06月29日 ]

Resolutions
① Proposal 1 About business report in 2013 (business report)
② Proposal 2 2013 financial statements (audit report, inventory, balance sheet, income statement)
③ Proposal 3 Matter (business plan) about 2014 business plan
④ Proposal 4 Matter related to FY 2014 budget (Budget budget book)
⑤ Proposal 5 Changes of the Articles (Changes of the Articles)
⑥ Proposal 6 About 2015 business plan and income and expenditure budget (business plan, income and expenditure budget book)
   (A two-year business plan was required for the application to change the articles.)
⑦ Proposal 7 Election of seven directors: All seven directors whose terms have expired have been reappointed
⑧ Proposal 8 Appointment of one auditor ... one auditor whose term of office has expired has been reappointed

    PVAJ Members Page
  • Join
  • facebook